Crossing Signal Inspections

Inspections have been scheduled and are on the calendar through December 2022. These include all monthly, quarterly, annual, 4-year, and 10-year inspections.

New Brightside Upper Quadrant Wig-Wag

The north Brightside wig-wag signal was converter to upper quadrant. The Brightside wig-wags were originally mounted on extended masts in order to prevent being hit by trucks from the quarry that once operated above Brightside yard.

With the quarry closed we decided to bring the wig-wags back down to earth. The north signal has now been converted to upper quadrant with the south signal to follow. We also restored and installed a vintage set of US&S HC-81 flashing lights.

2021 RWP Training

RWP Training will be held at 8:30AM on May 1st and May 8th in the White House.  All Signal Department members that work near the track are required to attend one of the classes.

Crossing Signal Inspections

Inspections have been scheduled and are on the calendar through December 2021. These include all monthly, quarterly, annual, 4-year, and 10-year inspections.

Signal Inspections Resume

Brightside is open once again. Scheduled signal inspections were conducted today, 7/11/2020.